EX-01

Working

Excavator · Caterpillar 390F (2019) · 8,866 h · Scroggie Creek

Last seen 11:12:50

Digital twin
Live machine view
Work cycle, load, fuel and lamps follow live telemetry. Drag to rotate, scroll to zoom.
Working
Assignment
Feeding WP-1
Operator Helder Ribeiro

Wash plant

s-scr-wp1

Hours today

3.5 h

Cycle time

34s

Cycles today

295

Engine hours

8,866 h

Next service

in 310 h

Telemetry
Live readings

Engine speed

1,788rpm

Coolant

93.4°C

Hydraulic oil

77.9°C

Hydraulic pressure

334bar

Bucket fill

100%

Fuel burn

62L/h
Fuel
Tank level
49%

487 L

In tank

62.0 L/h

Burn

7.8 h

Range

Utilisation
Hours on this shift

3.5 h

of a 12 h shift · 29% utilisation

Load

100%

Engine speed

1,788 rpm

Coolant

93 °C

Per hour
Utilisation and fuel burned today
Production day starts at 07:00.

Utilisation · %

Fuel · L

Alarms
Alarms (0)

No alarms on this unit in the last 48 hours.

Engine history
Engine speed, coolant and fuel level

Engine speed · rpm

Coolant · °C

Fuel level · %