EX-01
WorkingExcavator · Caterpillar 390F (2019) · 8,866 h · Scroggie Creek
Last seen 11:05:03
Digital twin
Live machine view
Work cycle, load, fuel and lamps follow live telemetry. Drag to rotate, scroll to zoom.
Working
Assignment
Feeding WP-1
Operator Helder Ribeiro
Wash plant
s-scr-wp1
Hours today
3.4 h
Cycle time
30s
Cycles today
287
Engine hours
8,866 h
Next service
in 311 h
Telemetry
Live readings
Engine speed
1,691rpm
Coolant
89.2°C
Hydraulic oil
71.7°C
Hydraulic pressure
317bar
Bucket fill
83%
Fuel burn
57.2L/h
Fuel
Tank level
49%
487 L
In tank
57.2 L/h
Burn
8.5 h
Range
Utilisation
Hours on this shift
3.4 h
of a 12 h shift · 28% utilisation
Load
83%
Engine speed
1,691 rpm
Coolant
89 °C
Per hour
Utilisation and fuel burned today
Production day starts at 07:00.
Utilisation · %
Fuel · L
Alarms
Alarms (0)
No alarms on this unit in the last 48 hours.
Engine history
Engine speed, coolant and fuel level
Engine speed · rpm
Coolant · °C
Fuel level · %