Serra de l'Ebre
Needs attentionCatalonia · Wind · 57 MW installed · 5 technicians · manager Firas Cheaib
11.8 MW
21 %
171 MWh
96.6 %
9 / 13
6
Wind
6.0 m/s E
Irradiance
252 W/m²
Temperature
20.9 °C
Cloud cover
65 %
Conditions
Partly cloudy
Substation
Ascó SE 400 kV
Voltage
399.0 kV
Frequency
50.018 Hz
Power factor
0.983
Curtailment
8 %
Day-ahead price
68.15 €/MWh
Assets
13 assets on site. Open one for its live 3D view.
Wind turbine
WTG-03
Siemens Gamesa SG 5.0-145 · 6.2 MW
Output
0.05 MW
Today
30.6 MWh
Wind
4.4 m/s
Wind turbine
WTG-04
Siemens Gamesa SG 5.0-145 · 5.0 MW
Output
0.48 MW
Today
19.5 MWh
Wind
6.7 m/s
Wind turbine
WTG-05
Siemens Gamesa SG 6.6-170 · 6.2 MW
Output
0.00 MW
Today
8.1 MWh
Wind
6.1 m/s
Wind turbine
WTG-07
Siemens Gamesa SG 5.0-145 · 5.0 MW
Output
0.00 MW
Today
19.1 MWh
Wind
5.5 m/s
Wind turbine
WTG-09
Siemens Gamesa SG 6.6-170 · 6.2 MW
Output
1.11 MW
Today
11.4 MWh
Wind
9.4 m/s
Wind turbine
WTG-10
Siemens Gamesa SG 6.6-170 · 4.2 MW
Output
3.85 MW
Today
10.5 MWh
Wind
12.6 m/s
Inverter skid
INV-01
Sungrow SG3125HV-MV · 4.6 MVA
Output
0.28 MW
Today
16.8 MWh
Availability
99.5 %
Inverter skid
INV-02
SMA Sunny Central 4600 UP · 3.1 MVA
Output
0.19 MW
Today
7.4 MWh
Availability
96.3 %
Blade ice detected
Generator winding temperature high
Yaw misalignment above limit
Pitch system hydraulic pressure low
Cooling fan failure
Service interval exceeded